Industry

RBG ACOSA Kodersdorf

  • Overview

    • Client: ACOSA
    • Construction year: 2018
    • Project: Regalbediengerät
    • Project Engineer: Mr. Petter

Software development PLC (S7-1500) and PCS

Connection to SAP

Electrical engineering (EPLAN)

Control cabinet construction

Assembly of electrical components

High-bay warehouse with 470 dynamic storage spaces

1 Storage point

1 Swap point

BSH Wroclaw Montagelinie

  • Overview

    • Client: Axmann
    • Construction year: 2017
    • Project: BSH Bosch Hausgeräte
    • Project Engineer: Mr. Petter

Software development PLC (S7-1500) and PCS

Connection to Logistics system

Installation of electrical components

BMW Engine block heat treatment

  • Overview

    • Client: Axmann
    • Construction year: 2013
    • Project: BMW Landshut
    • Project Engineer: Mr. Petter

Software development PLC (S7-317F) and PCS(WinCC flexible)

Connection to Logistics system

Installation of electrical components

High-bay warehouse with 32 storage spaces

1 Shelf robot

1 Stacking robot

RECTICEL High-bay warehouse with 4 RBGs

  • Overview

    • Client: Axmann
    • Construction year: 2011
    • Project: Recticel RBG
    • Project Engineer: Mr. Petter

Software development PLC (S7-416) and PCS (Intouch,WinCC flexible)

Connection to Logistics system

Installation of electrical components

Establishment of telecontrol technology

High-bay warehouse with 600 storage spaces

16 automatic charging stations

4 shelf robots

WHIRLPOOL Clyde (Ohio) High-bay warehouse

  • Overview

    • Client: Axmann, Willcox & Allen
    • Construction year: 2010
    • Project: Whirlpool RBG
    • Project Engineer: Mr. Petter

Software development PLC (Rockwell 1756-L61and PCS(PanelView 1000)

Connection to Logistics system

Electrical engineering (EPLAN P8) according to UL standard

Control cabinet construction

Assembly of electrical components

Establishment of telecontrol technology

High-bay warehouse with 61 storage spaces

1 manuell charging station

1 automatic charging station

1 Shelf robot

up to 40Warehouse journeys per hour

BSH Giengen

  • Overview

    • Client: BSH (Bosch Siemens Hausgeräte GmbH)
    • Construction year: 2009
    • Project: Refrigerator production – assembly line
    • Project Engineer: Mr. Petter

Software development SPS (S7-300) and PLS

Programming of a complete assembly line

Electrical engineering (EPLAN8)

Assembly and commissioning of the electrical engineering

KÖPPERN Roller presses

  • Overview

    • Client: Maschinenfabrik Köppern GmbH & Co. KG
    • Construction year: 2008
    • Project: Roller presses
    • Leiter: Mr. Seelig

Software development SPS (S7-300) and PLS (Intouch 10.0)

Electrical engineering (EPLAN8)

Control cabinet construction

Assembly of electrical components

Installation of medium voltage systems

Installation of drives and frequency converters up to 1MW

Establishment of telecontrol technology

Worldwide commissioning

SIEMENS Heating shelf Shanghai

  • Overview

    • Client: SIEMENS Shanghai
    • Construction year: 2008
    • Project: High bay warehouse with 2 shelf robots
    • Project Engineer: Mr. Seelig, Mr. Petter

Software development PLC (S7-300) and PCS(WinCC-Flexible)

Connection to controlling server

Connection to Casting chamber server

Electrical engineering (EPLAN8)

Control cabinet construction

Assembly of electrical components

Establishment of telecontrol technology

High-bay warehouse with 48 storage spaces

6 Release Stations

2 Casting chambers

2 Shelf robots

up to 40Warehouse journeys per hour

BSH St. Petersburg

  • Overview

    • Client: BSH (Bosch Siemens Hausgeräte GmbH)
    • Construction year: 2007
    • Project: Refrigerator production
    • Leiter: Mr. Seelig

Software development PLC (S7-400) and PCS

Electrical engineering (EPLAN8)

Control cabinet construction

Assembly and commissioning of the electrical engineering

Establishment of telecontrol technology

BSH Traunreut

  • Overview

    • Client: BSH (Bosch Siemens Hausgeräte GmbH)
    • Construction year: 2007
    • Project: Free standing cooker production
    • Project Engineer: Mr. Seelig, Mr. Petter

Software development PLC (S7-400) and PCS

Programming of a complete assembly line

Control cabinet construction

Assembly and commissioning of the electrical engineering

Establishment of telecontrol technology

RWEISS Verpackungs­technik

  • Overview

    • Client: R. Weiss Maschinenbau GmbH Crailsheim
    • Construction year: 2009
    • Project: Palettieranlage
    • Project Engineer: Mr. Petter

Software development PLC ((B&R X20 CP1484) and PCS

Programming of a complete conveyor technology

Electrical engineering (EPLAN8)

Assembly and commissioning of the electrical engineering

Commissioning