Sewage technology

Municipal sewage treatment plant Prinzenstein

  • Overview

    • Client: OWV Oranienbaum
    • Construction year: 2008
    • Project: modification sewage works Prinzenstein
    • Project Engineer: Mr. Petter

Modification of the existing system during operaton

Project planning electrical engineering, control cabinet construction

Installation of outdoor lighting

Programming PLC S7, Panansonic, AEG and SAE

Networking of the individual system parts with each other

Connection of the various controls via PLC FP2 from Panasonic (RK512, KS-Functions, Profibus, Multitrop)

Expansion of the central visualization with InTouch 10.0

Logging, accounting with ACRON

Integration / Extension of telecontrol technology

Industry – Modification Infra Zeitz

  • Overview

    • Client: Infra Zeitz
    • Construction year: 2010
    • Project: Renewal of the PLC and control system technology
    • Project Engineer: Mr. Seelig

Modification of the existing system during operaton

Project planning electrical engineering, control cabinet construction

Programming PLC S7 and PLS Intouch

Networking of the individual system parts

Industry – Modification Infra Zeitz

  • Overview

    • Client: Martin Systems AG
    • Construction year: 2007
    • Project: Ship sewage treatment plants
    • Project Engineer: Mr. Wengler

Electrical planning (EPLAN)

Control cabinet construction

Programming PLC (S7-300)

Programming PCS (Beyer)

Commissioning

Municipal – station maintenance AZV Espenhain

  • Overview

    • Client: Abwasserzweckverband Espenhain
    • Construction year: 2003-2010
    • Project: Stationswartung
    • Project Engineer: Mr. Petter

Maintenance of over 86 pumping stations

Maintenance and Terrain maintenance

24h operational readiness

Programming of the pumping stations

Programming the alarm center (AEG, Panasonic)

Connections with MODBUS, SEAB, MEWTOCOL, GPRS

Programming of PCS (InTouch)

Fault notification (Cityruf, SMS)

Establishment of telecontrol technology

Advice on new systems

Municipal – sewage plant Markkleeberg

  • Overview

    • Client: KWL
    • Construction year: 2004
    • Project: sewage plant
    • Project Engineer: Mr. Seelig, Mr. Petter

Software development PLC(S7-400H) and PCS(iFix)

Usage of Profibus DP, PA

Commissioning

Accompaniment in the running-in operation

Municipal – sewage plant Taucha

  • Overview

    • Client: KWL
    • Construction year: 2003
    • Project: sewage plant
    • Project Engineer: Mr. Seelig, Mr. Petter

Software development PLC(Opto22) and PCS(iFix)

Schematic creation

Maintenance of measurement technology

Municipal – Industrial location Boehlen

  • Overview

    • Client: Abwasserzweckverband Espenhain
    • Construction year: 2004
    • Project: Rainwater and sewage pumping stations
    • Project Engineer: Mr. Petter

Electrical planning (EPLAN), control cabinet construction, Commissioning

Programming PLC (Schneider)

Establishment of telecontrol technology